Buyer Guides · 8 min read
Off-plan handover and snagging in Dubai
The EQT Private Office · RERA-registered brokerage · Published April 20, 2026 · Updated August 3, 2026

Handover is the point at which a completed off-plan property is transferred to you, and snagging is the inspection you carry out beforehand to find and list defects the developer must fix. In short, you snag first to check quality, then accept handover once you are satisfied and any final payments and fees are settled. Getting this stage right protects the value of your purchase and saves you from paying to fix the developer's mistakes, so it is worth approaching methodically rather than rushing to collect the keys.
Key takeaways
- •Handover is when the developer transfers your completed unit to you.
- •Snagging is the pre-acceptance inspection to identify defects for the developer to fix.
- •Always snag before you formally accept handover of the property.
- •At handover your Oqood is converted into a DLD title deed.
- •Settle any final balance and outstanding fees to complete the process.
- •A professional snagging inspection can catch issues an untrained eye misses.
What happens at handover
Handover is the moment your off-plan purchase becomes a real, usable property in your hands. Once the developer has completed construction and obtained the necessary completion approvals, including the building completion certificate from the authorities, they issue a handover notice inviting buyers to inspect the unit, settle any final payments and formally take possession of their home. You will usually be given a window in which to complete the process.
This stage also completes the ownership record. The interim Oqood registration that secured your unit during construction is converted into a full title deed in your name at the Dubai Land Department. Alongside the keys, you should receive the documentation and access details for your unit, such as access cards and utility connection information, and you become responsible for service charges on the property going forward.
What snagging means and why it matters
Snagging is the process of inspecting a newly built property for defects, known as snags, before you accept it. These can range from cosmetic issues such as paint marks and scratches to more serious problems with plumbing, electrics, air conditioning or finishing. The point of snagging is to catch these before handover so the developer fixes them at their cost, not yours, while their contractual responsibility for the build quality is still clearly in force.
Snagging matters because once you accept a property, getting defects fixed can become harder and slower. A thorough inspection while the developer is still responsible for the build is your best protection. Many buyers hire a professional snagging company, whose inspectors use tools such as moisture meters, thermal cameras and electrical testers, know exactly what to test, and can produce a detailed, room by room report the developer can act on.
- •Cosmetic issues such as paint marks, scratches and uneven finishes.
- •Doors, windows and cabinetry that do not close or align properly.
- •Plumbing problems including leaks and poor water pressure.
- •Electrical faults and non working sockets or fixtures.
- •Air conditioning performance and ventilation issues.
- •Tiling, flooring and grouting defects.

The handover and snagging process step by step
The path from a completion notice to accepting your keys follows a clear sequence. Working through it methodically means you accept the property only once it meets the standard you paid for, and it keeps the responsibility for any defects with the developer rather than passing to you.
The steps below outline the typical journey. Timelines vary by developer, but the order is broadly consistent across projects, and building in enough time for a proper inspection and a re-inspection is well worth it.
- •Receive the developer's notice that the unit is ready for handover.
- •Arrange a snagging inspection, ideally with a professional inspector.
- •Compile a snag list of every defect found during the inspection.
- •Submit the list and allow the developer to carry out repairs.
- •Re-inspect to confirm the snags have been fixed properly.
- •Settle final payments and fees, then accept handover and collect the keys.
How to run an effective snagging inspection
A good inspection is systematic. Go through the property room by room in daylight where possible, test every switch, socket, tap and appliance, open and close each door, window and cabinet, and run the air conditioning long enough to confirm it cools properly. Check under sinks and around the bathrooms for leaks, look along walls and ceilings for cracks or damp patches, and confirm the finishes match the specification you were promised.
Documenting everything is what turns an inspection into a useful tool. Photograph each defect, note its exact location, and compile the findings into a single clear list you can hand to the developer, which also gives you a record if you need to follow up. Whether you inspect yourself or hire a professional, the aim is the same: a complete, evidenced snag list that leaves no ambiguity about what needs to be put right before you accept.
- •Inspect room by room, ideally in daylight, and take your time.
- •Test every socket, switch, tap, door, window and appliance.
- •Run the air conditioning to confirm it cools each room properly.
- •Check for leaks, cracks, damp and uneven or damaged finishes.
- •Photograph and note the location of every defect for the report.

After handover: warranties and service charges
Accepting handover is not the end of your protection. Newly built properties in Dubai typically come with warranty coverage, which can require the developer to remedy certain defects that appear after completion, commonly a one year cover for general workmanship and mechanical or electrical items and a longer structural warranty of up to ten years. Keep your snagging report and handover documents, as they support any later claims.
From handover onwards you also become liable for service charges, which fund the upkeep of shared areas and facilities and are governed through the DLD's Mollak system. These are usually charged per square foot of your unit and can vary significantly between a simple building and a luxury tower with extensive amenities. Factor these ongoing costs into your budget from day one, and review the charge for your building so there are no surprises once you own the property.
Frequently asked
What is snagging in Dubai off-plan property?+
Snagging is inspecting a newly built property for defects before you accept handover. Issues can range from cosmetic marks to faults in plumbing, electrics or air conditioning. You compile a snag list, the developer fixes the problems at their cost, and you re-inspect before accepting. This protects you from paying to correct the developer's mistakes.
Should I snag before or after handover?+
Always snag before you formally accept handover. Once you accept the property, getting defects fixed can become harder, so the inspection should happen while the developer is still responsible for the build. Compile your snag list, allow the developer to carry out repairs, then re-inspect and only accept once you are satisfied.
Do I get my title deed at handover?+
Yes. At handover, the interim Oqood registration that secured your unit during construction is converted into a full title deed in your name at the Dubai Land Department. You settle any final balance and outstanding fees as part of completing the process, and you receive the keys and documentation for your property.
Do I need a professional snagging inspector?+
It is not mandatory, but it is strongly recommended. Professional inspectors know exactly what to test, from air conditioning performance to hidden plumbing and electrical faults, and they produce a detailed report the developer can act on. Their trained eye often catches issues a buyer would miss, which can save significant cost and hassle later.
When do service charges start on an off-plan property?+
You become liable for service charges from handover, once you take possession of the completed unit. These charges fund the upkeep of shared areas and facilities and are governed through the DLD's Mollak system. Review the charge for your building before handover so you can budget for this ongoing cost from day one.
What if the developer will not fix my snags?+
Keep your dated, photographed snag list and all correspondence, since these are your evidence. Many defects are covered by the developer's warranty, and you can escalate unresolved issues through the developer's formal channels and, if needed, the relevant authorities. This is exactly why you should snag and get repairs confirmed before accepting handover rather than after.